What should I watch tonight?
Pick a mood and get three: the masterpiece, what's trending and a recent hit.

The engineering journey to Starship and beyond.
Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.
No streaming information yet.
Availability by JustWatch
























Critical Path (2026) doesn't have enough ratings for a Lantern Score yet.